色欲久久久天天天综合网丨亚洲一区精品二人人爽久久丨99久久人妻无码精品系列蜜桃丨毛片无遮挡高清免费丨又粗又黄又猛又爽大片免费

CTG’s First PV hydrogen production project successfully connected to grid

2024-03-28

  On December 29, CTG’s first PV hydrogen production project was successfully connected to the grid. Located in Inner Mongolia Autonomous Region, the project comprises a 400 MW PV plant and a 75 MW hydrogen production facility. The integrated project is expected to generate approximately 740 GWh of energy annually, producing 10,000 tonnes of hydrogen and 80,000 tonnes of oxygen as a byproduct, saving 227,000 tonnes of standard coal and reducing carbon emissions by about 594,000 tonnes.

1

  

  

瀏覽次數: